At the process
Pressure is available, but the task is not being achieved.
Pressure at the pump does not describe the flow, spray pattern or pressure reaching every nozzle.
Selection focus
Compare the nozzle arrangement and simultaneous demand with pump delivery and line losses. For cleaning or descaling, include the surface condition and operating sequence so the requirement describes the work to be done.