Established in 1984, BBP manufactures high-pressure plunger pumps and industrial pumps for cleaning, testing and fluid transfer.
Inspection and testing are reviewed against the selected pump, operating duty and agreed order scope. The applicable setup, acceptance criteria and records depend on the equipment configuration and requirements confirmed for each enquiry.
Share the working liquid, required flow, head or pressure, operating cycle and requested test documentation. Confirm the relevant duty points and any witnessing arrangements with the BBP team before placing an order.

Main inspection and testing areas
Review topics help define the inspection scope for an enquiry. Test points, acceptance criteria, witnessing and records are confirmed for the selected equipment and order.
| Inspection area | Equipment / drawing basis | Test requirements | Acceptance criteria | Records & witnessing | |
|---|---|---|---|---|---|
| Specified | Agreed scope | ||||
| Application & design review | Confirm model, construction and drawing revision | Project-specific | Review the working liquid, duty point, installation conditions and requested equipment arrangement. | Confirm before order placement | Agree with BBP for the order |
| Materials & component requirements | Confirm model, construction and drawing revision | Project-specific | Review the material requirements and drawings for the selected pump and component construction. | Confirm before order placement | Agree with BBP for the order |
| Casting & heat treatment | Confirm model, construction and drawing revision | Project-specific | Casting and heat treatment form part of component production and material processing. | Confirm before order placement | Agree with BBP for the order |
| Machining & dimensional review | Confirm model, construction and drawing revision | Project-specific | Dimensions, fits and component interfaces are relevant to pump assembly and OEM parts enquiries. | Confirm before order placement | Agree with BBP for the order |
| Assembly & equipment arrangement | Confirm model, construction and drawing revision | Project-specific | Review the assembled pump, drive and auxiliaries against the requested configuration. | Confirm before order placement | Agree with BBP for the order |
| Workshop testing | Confirm model, construction and drawing revision | Project-specific | Confirm the duty points, applicable test requirements and requested test records with the team. | Confirm before order placement | Agree with BBP for the order |
| Documents & technical clarification | Confirm model, construction and drawing revision | Project-specific | Check the equipment records and the named holders, dates and scope of the supplied company documents. | Confirm before order placement | Agree with BBP for the order |